The IJC’s work come from documents received by the Canadian and US governments outlining the IJC’s responsibilities. These are known as applications and references and are organized by docket. Key documents such as letters from governments assigning work to the IJC, task force or study board reports to the IJC, and final reports and letters from the IJC to the governments are available from the website.

Displaying 1 - 22 of 22.

Date
A Reference to examine and report on current efforts to address water quality issues in lakes Champlain and Memphremagog, with a particular focus on high phosphorus levels and the proliferation of algal blooms, and to make recommendations on how to improve water quality in both lakes.
Bundle name
Docket
Date
A Reference to collect and harmonize data on the topography, bathymetry, aquatic vegetation, soil texture and other features of the Lake Champlain and Richelieu River watershed and to create static flood-inundation maps showing the areas, where data are available, that would be affected at different...
Bundle name
Docket
Date
A Plan of Study in response to a request by Governments that the IJC review and make recommendations regarding a comprehensive study of measures to mitigate flooding and the impacts of flooding in the Richelieu River and Lake Champlain Basin.
Bundle name
Docket
Date
A Reference to coordinate initiatives in both countries to reduce phosphorus loading to Missisquoi Bay on Lake Champlain
Bundle name
Docket
Date
A Reference to review plans by the State of Vermont to modernize the Alburg-Swanton Bridge, involving the partial removal of the existing causeway, and to provide advice on whether this complies with the terms of the Boundary Waters Treaty of 1909 as concerns causing pollution to the injury of...
Bundle name
Docket
Date
An application by the Georgia-Pacific Corporation to reconstruct and maintain a diversion dyke in the St. Croix River near Baileyville, Maine.
Bundle name
Docket
Date
An Application by Canada for Richelieu River flood control works including dredging of the Richelieu River channel and construction of a fixed-crest weir at St. Jean, Quebec.
Bundle name
Docket

98R

Date
A Reference to investigate and report on the feasibility and desirability of regulating the flooding of the Richelieu River in Quebec for the purpose of alleviating flooding in the Richelieu River and Lake Champlain.
Bundle name
Docket

87A

Date
An Application by the St. Croix Paper Company to replace an existing timber dam at the outlet of East Grand Lake in the St. Croix River at Forest City. (See Dockets 10 and 11).
Bundle name
Docket

80A

Date
An Application by the St. Croix Paper Co. for approval to replace the small storage dam some 30 years old at Vanceboro at the outlet of Spednik Lake.
Bundle name
Docket

77R

Date
A Reference to report on the feasibility and economic advantages of improving or developing a waterway from the St. Lawrence River to the Hudson River.
Bundle name
Docket

72R

Date
A Reference to estimate the cost of developing the international tidal power potential of Passamaquoddy Bay jointly between the United States and Canada. Also, to determine the economic feasibility of the project and its effects on the local and national economies.
Bundle name
Docket

71R

Date
A Reference to study the development of water resources in the St. Croix River basin and to recommend actions for the use, conservation, and regulation of the basin\'s waters.
Bundle name
Docket

60R

Date
A Reference to review existing plans for the development of tidal power in Passamaquoddy and Cobscook Bays and evaluate the costs to determine the practicability of any of the plans.
Bundle name
Docket

38A

Date
An Application by the Government of Canada for the construction of remedial works on the Richelieu River for the reclamation and protection of lowlands in St. Jean, Iberville and Missisquoi counties in southern Quebec.
Bundle name
Docket

37R

Date
A Reference to investigate the practicability of a deep waterway from the St. Lawrence River to the Hudson River via Lake Champlain. See also Docket 77.
Bundle name
Docket

32A

Date
An Application by the Canadian Cottons Limited to reconstruct the Milltown Dam on the St. Croix River.
Bundle name
Docket

28A

Date
An Application by the St. Croix Water Power Company and Sprague's Falls Manufacturing Company for approval to raise the maximum forebay level of Grand Falls Dam on the St. Croix River.
Bundle name
Docket

18A

Date
An Application by the 1State of Maine to grant authority to all dam owners on the St. Croix River to erect and repair suitable fish ways in their dams.
Bundle name
Docket

16A

Date
An Application by the 1Canadian Cottons Ltd. to construct a powerhouse on the U.S. side of the St. Croix River at Milltown.
Bundle name
Docket

11A

Date
An Application by the Sprague's Falls Manufacturing Company (See also Docket 10).
Bundle name
Docket

10A

Date
An Application by the St. Croix Water & Power Company for approval of works already under construction, consisting of a dam across the St. Croix River at Grand Falls and also for the diversion of the waters of the river for electric power generation in the State of Maine (See also Docket 11).
Bundle name
Docket