Publications

IJC publications contain both board and corporate documents, including reports, fact sheets, infographics, and presentations. Contractor reports are created on behalf of or in coordination with the IJC or its boards by a separate entity, including individuals, companies, and governments. Government reports are documents developed by US or Canadian local/provincial/state/federal government that are of interest to the IJC or board.

IJC Content

Displaying 1 - 50 of 52.

Date
Precis
In 2023 the WQB, with a team of consultants, produced a report that collected and analyzed ecological, economic, social, political, demographic, technological and cultural data to identify key drivers and trends expected to influence the Great Lakes region over the next 30 years. From this, four...
Bundle name
Publication
Date
Precis
The 139th semi-annual progress report to the International Joint Commission from the International Lake Ontario - St. Lawrence River Board, covering the period from 1 September 2022 through 28 February 2023.
Bundle name
Publication
Date
Precis
The 138th semi-annual progress report to the International Joint Commission from the International Lake Ontario - St. Lawrence River Board, covering the period from 1 March 2022 through 31 August 2022.
Bundle name
Publication
Date
Precis
Annex 10 (Science) of the Great Lakes Water Quality Agreement assigns the International Joint Commission (IJC) and its Science Advisory Board (SAB) a role in providing input to the Parties on priority science issues on a three year basis. This document summarizes the SAB’s advice to the Parties on...
Bundle name
Publication
Date
Precis
The 137th semi-annual progress report to the International Joint Commission from the International Lake Ontario - St. Lawrence River Board, covering the period from 1 September 2021 through 28 February, 2022.
Bundle name
Publication
Date
Precis
The Great Lakes – St. Lawrence River Adaptive Management Committee (GLAM Committee) of the International Joint Commission (IJC) began Phase 1 of the expedited review of Plan 2014 in February 2020. The objective of Phase 1 was to assess flow releases under the International Lake Ontario – St...
Bundle name
Publication
Date
Bundle name
Publication
Date
Precis
International Souris River Study Board Operating Rules Review Task (OR1: Plain Language Review of the 1989 Agreement)
Bundle name
Publication
Date
Precis
International Souris River Study Board Data Collection and Management Task (DW1: Summarize POS Projects and Report Progress)
Bundle name
Publication
Date
Precis
International Souris River Study Board Data Collection and Management Task (DW2: Collation and Collection of Bathymetry and LiDAR data)
Bundle name
Publication
Date
Precis
International Souris River Study Board Data Collection and Management Task (DW2: Collation and Collection of Bathymetry and LiDAR data)
Bundle name
Publication
Date
Precis
International Souris River Study Board Data Collection and Management Task (DW3: Review and Update of Hydrometeorological Data Network)
Bundle name
Publication
Date
Precis
International Souris River Study Board Data Collection and Management Task (DW4: Data Collection for Performance Indicators)
Bundle name
Publication
Date
Precis
The 136th semi-annual progress report to the International Joint Commission from the International Lake Ontario - St. Lawrence River Board, covering the period from 1 March 2021 through 31 August, 2021.
Bundle name
Publication
Date
Precis
International Souris River Study Board Hydrology and Hydraulics Task (HH1: Regional and Reconstructed Hydrology)
Bundle name
Publication
Date
Precis
International Souris River Study Board Hydrology and Hydraulics Task (HH3: Artificial Drainage Impacts Review)
Bundle name
Publication
Date
Precis
International Souris River Study Board Hydrology and Hydraulics Task (HH6: Reservoir Flow Release Model (HEC-RESSIM))
Bundle name
Publication
Date
Precis
International Souris River Study Board Hydrology and Hydraulics Task (HH8: PRM Model)
Bundle name
Publication
Date
Precis
International Souris River Study Board Hydrology and Hydraulics Task (HH10: Forecasting Assessment)
Bundle name
Publication
Date
Bundle name
Publication
Date
Precis
International Souris River Study Board Plan Formulation Task (PF4: Roadmap for taking study product to address other concerns)
Bundle name
Publication
Date
Precis
Appendix 5 provides a brief summary of the Study's Technical Tasks and Reports and provides hyperlinks to the full versions of the technical reports.
Bundle name
Publication
Date
Bundle name
Publication
Date
Precis
The International Souris River Study Board held a virtual workshop with Indigenous Nations on March 12, 2021. This is a summary report of that workshop.
Bundle name
Publication
Date
Precis
International Souris River Study Board Hydrology and Hydraulics task, Reservoir Flow Release Modelling (HEC-RAS) Report
Bundle name
Publication
Date
Precis
Appendix to Section 6 of the Souris Study Board report - Evaluation of the Alternative Operating Plan Measures Reading Performance Indicator Plots
Bundle name
Publication
Date
Precis
The November 6-7 2019 Indigenous Nations Workshop at the International Peace Garden was intended to obtain the insights of Tribes in the United States, and First Nations and the Métis Nation in Canada (i.e. Indigenous Nations who may have vested interests in the Souris River Basin), to better...
Bundle name
Publication
Date
Precis
The International Souris River Study Board (ISRSB) undertook a number of Indigenous engagement initiatives as part of their efforts to inform the study of Indigenous rights holders’ interests in the Souris River watershed and the river’s flow operations. The virtual workshop with Indigenous Nations...
Bundle name
Publication
Date
Bundle name
Publication
Date
Bundle name
Publication
Date
Precis
The 135th semi-annual progress report to the International Joint Commission from the International Lake Ontario - St. Lawrence River Board, covering the period from 1 September 2020 through 28 February, 2021.
Bundle name
Publication
Date
Precis
The 135th semi-annual progress report to the International Joint Commission from the International Lake Ontario - St. Lawrence River Board, covering the period from 1 September 2020 through 28 February 2021.
Bundle name
Publication
Date
Precis
Bundle name
Publication
Date
Bundle name
Publication
Date
Bundle name
Publication
Date
Precis
The 134th Progress Report to the International Joint Commission by the International Lake Ontario-St. Lawrence River Board, covering the period March 1, 2020 through August 31, 2020.
Bundle name
Publication
Date
Precis
One Hundred and Thirty-Third Progress Report to the International Joint Commission by the International Lake Ontario-St. Lawrence River Board Covering the Period 1 September 2019 through 29 February 2020
Bundle name
Publication
Date
Bundle name
Publication
Date
Precis
This report represents a peer review of the RESPEC report (2016 report: The development of a Stressor Response Model for the Red River of the North, referred to in this document as the “report” for brevity), with specific attention to concerns raised by the Minnesota municipalities (Letter of July...
Bundle name
Publication
Date
Precis
This report summarizes the results of the first phase of a project to address the need for Water Quality Objectives and Alert Levels for the Rainy-Lake of the Woods Watershed. Water Quality Objectives are internationally agreed upon standards, whereas Alert Levels are advisory level triggers that...
Bundle name
Publication
Date
Precis
One Hundred and Thirty-Second Progress Report to the International Joint Commission by the International Lake Ontario-St. Lawrence River Board Covering the Period 1 March 2019 through 31 August 2019
Bundle name
Publication
Date
Precis
The 131st Progress Report to the International Joint Commission by the International St. Lawrence River Board of Control, covering the period of September 1, 2018 to February, 28 2019.
Bundle name
Publication
Date
Precis
In 2016-2017 the International Joint Commission’s Science Advisory Board, Science Priority Committee, completed an analysis of commercial fertilizer and manure application in the western Lake Erie basin. The resulting report was adopted by the International Joint Commission and is available at...
Bundle name
Publication
Date
Precis
In this report, ECCC provides the results of trend analyses for water chemistry data obtained at both the Forest City and Milltown stations. Mann-Kendall trend tests (or the Seasonal variant of the test) were conducted for each water quality parameter, to identify monotonic changes in concentrations...
Bundle name
Publication
Date
Precis
The IJC’s Great Lakes - St Lawrence River Adaptive Management (GLAM) Committee has prepared a review of impacts across all sectors that were affected by high water levels in 2017 as well as an assessment of how the regulation of outflows from Lake Ontario impacted levels throughout the system...
Bundle name
Publication
Date
Precis
The 130th Progress Report to the International Joint Commission by the International St. Lawrence River Board of Control, covering the period of March 1, 2018 to August 31, 2018.
Bundle name
Publication
Date
Bundle name
Publication
Date
Precis
The 128th Progress Report to the International Joint Commission by the International St. Lawrence River Board of Control, covering the period of March 1, 2017 through August 31, 2017.
Bundle name
Publication