Publications

IJC publications contain both board and corporate documents, including reports, fact sheets, infographics, and presentations. Contractor reports are created on behalf of or in coordination with the IJC or its boards by a separate entity, including individuals, companies, and governments. Government reports are documents developed by US or Canadian local/provincial/state/federal government that are of interest to the IJC or board.

IJC Content

Displaying 1 - 50 of 125.

Date
Precis
The division of the waters of the St. Mary River and Milk River, including its tributaries, is governed by the Boundary Waters Treaty of 1909 which specifies the proportion of the natural flow to which each country is entitled. The subsequent Order of the International Joint Commission (IJC) dated...
Bundle name
Publication
Date
Precis
In 2023 the WQB, with a team of consultants, produced a report that collected and analyzed ecological, economic, social, political, demographic, technological and cultural data to identify key drivers and trends expected to influence the Great Lakes region over the next 30 years. From this, four...
Bundle name
Publication
Date
Precis
The 2022 Osoyoos Lake (nk’mip) Water Science Forum was hosted by the Osoyoos Indian Band and the Town of Osoyoos, October 27 - 29, 2022, in sẃiẃs (Osoyoos, B.C.) The forum was presented by the Okanagan Basin Water Board, the International Joint Commission, the Okanagan Nation Alliance, along with...
Bundle name
Publication
Date
Precis
February 2023 slide deck from NOAA - Current Conditions and Outlook for Rainy River Basin
Bundle name
Publication
Date
Precis
Water Levels Committee: Pre-Spring Engagement - February 27, 2023 slide deck Base Flows Snowpack Temperature Overall Picture Long-Range forecasts and Climate
Bundle name
Publication
Date
Precis
As part of the International Rainy Lake of the Woods Watershed Board’s implementation of the IJC’s climate change guidance framework, the Adaptive Management Committee engaged water resources experts, IJC staff, and the public in a half-day, in-person workshop in Fort Frances, ON on the margins of...
Bundle name
Publication
Date
Precis
Annex 10 (Science) of the Great Lakes Water Quality Agreement assigns the International Joint Commission (IJC) and its Science Advisory Board (SAB) a role in providing input to the Parties on priority science issues on a three year basis. This document summarizes the SAB’s advice to the Parties on...
Bundle name
Publication
Date
Bundle name
Publication
Date
Bundle name
Publication
Date
Precis
The Great Lakes – St. Lawrence River Adaptive Management Committee (GLAM Committee) of the International Joint Commission (IJC) began Phase 1 of the expedited review of Plan 2014 in February 2020. The objective of Phase 1 was to assess flow releases under the International Lake Ontario – St...
Bundle name
Publication
Date
Bundle name
Publication
Date
Precis
International Souris River Study Board Operating Rules Review Task (OR1: Plain Language Review of the 1989 Agreement)
Bundle name
Publication
Date
Precis
International Souris River Study Board Data Collection and Management Task (DW1: Summarize POS Projects and Report Progress)
Bundle name
Publication
Date
Precis
International Souris River Study Board Data Collection and Management Task (DW2: Collation and Collection of Bathymetry and LiDAR data)
Bundle name
Publication
Date
Precis
International Souris River Study Board Data Collection and Management Task (DW2: Collation and Collection of Bathymetry and LiDAR data)
Bundle name
Publication
Date
Precis
International Souris River Study Board Data Collection and Management Task (DW3: Review and Update of Hydrometeorological Data Network)
Bundle name
Publication
Date
Precis
International Souris River Study Board Data Collection and Management Task (DW4: Data Collection for Performance Indicators)
Bundle name
Publication
Date
Precis
International Souris River Study Board Hydrology and Hydraulics Task (HH1: Regional and Reconstructed Hydrology)
Bundle name
Publication
Date
Precis
International Souris River Study Board Hydrology and Hydraulics Task (HH3: Artificial Drainage Impacts Review)
Bundle name
Publication
Date
Precis
International Souris River Study Board Hydrology and Hydraulics Task (HH6: Reservoir Flow Release Model (HEC-RESSIM))
Bundle name
Publication
Date
Precis
International Souris River Study Board Hydrology and Hydraulics Task (HH8: PRM Model)
Bundle name
Publication
Date
Precis
International Souris River Study Board Hydrology and Hydraulics Task (HH10: Forecasting Assessment)
Bundle name
Publication
Date
Precis
International Souris River Study Board Plan Formulation Committee Task (PF2: HEC-Res Sim Alternatives Assessment)
Bundle name
Publication
Date
Precis
International Souris River Study Board Plan Formulation Task (PF4: Roadmap for taking study product to address other concerns)
Bundle name
Publication
Date
Precis
Appendix 5 provides a brief summary of the Study's Technical Tasks and Reports and provides hyperlinks to the full versions of the technical reports.
Bundle name
Publication
Date
Bundle name
Publication
Date
Precis
The International Souris River Study Board held a virtual workshop with Indigenous Nations on March 12, 2021. This is a summary report of that workshop.
Bundle name
Publication
Date
Precis
International Souris River Study Board Hydrology and Hydraulics task, Reservoir Flow Release Modelling (HEC-RAS) Report
Bundle name
Publication
Date
Precis
Appendix to Section 6 of the Souris Study Board report - Evaluation of the Alternative Operating Plan Measures Reading Performance Indicator Plots
Bundle name
Publication
Date
Precis
The November 6-7 2019 Indigenous Nations Workshop at the International Peace Garden was intended to obtain the insights of Tribes in the United States, and First Nations and the Métis Nation in Canada (i.e. Indigenous Nations who may have vested interests in the Souris River Basin), to better...
Bundle name
Publication
Date
Precis
The International Souris River Study Board (ISRSB) undertook a number of Indigenous engagement initiatives as part of their efforts to inform the study of Indigenous rights holders’ interests in the Souris River watershed and the river’s flow operations. The virtual workshop with Indigenous Nations...
Bundle name
Publication
Date
Precis
Questions and Answers from the June 2021 Virtual Public Meeting
Bundle name
Publication
Date
Bundle name
Publication
Date
Bundle name
Publication
Date
Precis
Technical Webinar - Risk perception surveys, vulnerability and other social science studies from International Joint Commission on Vimeo.
Bundle name
Publication
Date
Precis
Technical Webinar - Floodplain management considerations from International Joint Commission on Vimeo.
Bundle name
Publication
Date
Precis
Technical Webinar - Chambly Canal diversion (1) from International Joint Commission on Vimeo.
Bundle name
Publication
Date
Precis
Technical Webinar - How the LCRR study is assessing Climate Change from International Joint Commission on Vimeo.
Bundle name
Publication
Date
Precis
Technical Webinar - Development of a performance indicator for damages to residential buildings and its use in economic analys from International Joint Commission on Vimeo.
Bundle name
Publication
Date
Precis
Technical Webinar - Improvements in forecasting from International Joint Commission on Vimeo.
Bundle name
Publication
Date
Precis
Technical Webinar - Watershed Storage from International Joint Commission on Vimeo.
Bundle name
Publication
Date
Bundle name
Publication
Date
Bundle name
Publication
Date
Bundle name
Publication
Date
Precis
In the spring of 2019, flood inundation maps for the entire US Lake Champlain shoreline were completed from work realized in 2016 (the report is available at https://pubs.er.usgs.gov/publication/sir20185169). These maps show areas of land inundation along the Lake shoreline in New York and Vermont...
Bundle name
Publication
Date
Precis
This report represents a peer review of the RESPEC report (2016 report: The development of a Stressor Response Model for the Red River of the North, referred to in this document as the “report” for brevity), with specific attention to concerns raised by the Minnesota municipalities (Letter of July...
Bundle name
Publication
Date
Precis
This report summarizes the results of the first phase of a project to address the need for Water Quality Objectives and Alert Levels for the Rainy-Lake of the Woods Watershed. Water Quality Objectives are internationally agreed upon standards, whereas Alert Levels are advisory level triggers that...
Bundle name
Publication
Date
Precis
Public Presentation Material October 8, 2019
Bundle name
Publication
Date
Precis
This project seeks to address these concerns by conducting a comprehensive scientific review of the life histories and critical habitat of all known fish species inhabiting Lake St. Lawrence (Iroquois Dam to Moses-Saunders Dam). Historically low 2018 water levels in Lake St. Lawrence have prompted...
Bundle name
Publication
Date
Precis
In 2016-2017 the International Joint Commission’s Science Advisory Board, Science Priority Committee, completed an analysis of commercial fertilizer and manure application in the western Lake Erie basin. The resulting report was adopted by the International Joint Commission and is available at...
Bundle name
Publication