8A

Date
Topic

Hydro Power, St. Marys River Saulte

Description
An Application from Algoma Steel Corporation (now Great Lakes Power) in Canada to divert water from the St. Marys River for power purposes and to construct a control structure with gates (compensating works) across the St. Marys River. (See also Docket 6)
Outcome

The IJC approved the construction and operation of the compensating works.