United States Department of State
Washington, D. C. 20520
December 9, 1998
Gerald E. Galloway
Secretary, United States Section
International Joint Commission
Suite 100
1250 23rd St., NW
Washington, D.C. 20440
Dear Dr. Galloway:
I herewith transmit an application by the Buffalo and Fort Erie Public Bridge Authority for an IJC order of approval for the Peace Bridge Capacity Expansion Project: the construction of a multi-span, multiple steel arch bridge over the Niagara River and Black Rock Canal, between Fort Erie, Ontario and Buffalo, New York. The letter of application is accompanied by a document entitled "Hydrotechnical Report for Second Peace Bridge".
The Department would appreciate receiving the Commission's response to this application at your earliest possible convenience.
It is my understanding that a similar letter is being sent to the Secretary of the Canadian Section of the Commission by the Department of Foreign Affairs and International Trade.
Sincerely,
Victor D. Comras
Director
Office of Canadian Affairs
Attachments:
PARSONS
De Leuw, Cather & Company of New York, Inc. - A Unit of Parsons
Transportation Group Inc.
300 Cathedral Park Tower - 37 Franklin Street o Buffalo, New York 14202
- (716) 853-6940 - Fax: (716) 853-6192
November 25, 1998
Office of Canadian Affairs
Room 4511
U.S. Department of State
201 C Street N.W.
Washington, D.C. 20520
Attention: Mr. John Hall
| RE: | Peace Bridge Capacity Expansion Project (PBCEP)
Letter of Application for International Joint Commission Approval Boundary Waters Treaty 1909 |
Dear Sir:
Please find attached a Letter Application for International Joint Commission Approval. As discussed, we are sending twenty five (25) copies of the Letter Application and three (3) copies of the Final Hydrotechnical Report. We trust that the information provided will be sufficient for your review and submission to the International Joint Commission.
If you have any questions, require additional materials, or need modifications made to the letter application please contact the undersigned at 716-853-6940 Ext. 234.
A similar package has been sent to Mr. David Preston, Department of Foreign Affairs and International Trade, Ottawa, Ontario Canada.
Very truly yours,
DE LEUW, CATHER & CO. OF NEW YORK, INC.
Keith J. Harlock, P.E.
Project Manager
Attachments
| cc: | C.T. Elwood, PBA
G. T. Creary, DCCo. |
On behalf of
Buffalo and Fort Erie Public Bridge Authority
Peace Bridge Plaza
Buffalo, New York 14213
Phone: (716) 884-6744 1 Fax: (716) 884-1973
Contacts: Stephen F. Mayer, P.E., Operations Manager
Clifford T. Elwood, Projects Manager
Prepared by:
De Leuw, Cather & Co. of New York, Inc.
300 Cathedral Park Tower
37 Franklin Street
Buffalo, New York 14202
Phone: (716) 853-6940 1 Fax:(716) 853-6192
Contact: Keith J. Harlock, P.E., Project Manager
In conjunction with:
Wafts Engineers
3826 Main Street Buffalo, New York 14226
Phone: (716) 836-1540 1 Fax: (716) 836-2402
Contact: Justin K. Kellogg, M.S., Project Manager
Submitted to:
| Office of Canadian Affairs
Room 4511 U.S. Department of State 2201 C Street N.W. Washington, D.C. 20520 Phone: (202) 647-2185 Contact: John Hall | Department of Foreign Affairs and International Trade
US Trans Boundary Division 125 Sussex Drive Ottawa, Ontario KIA OG2 Phone: (613) 944-6909 Contact: David Preston, Director |
October 1998
PARSONS
De Leuw, Cather & Company of New York, Inc. - A Unit of Parsons
Transportation Group Inc.
300 Cathedral Park Tower - 37 Franklin Street o Buffalo, New York 14202
- (716) 853-6940 - Fax: (716) 853-6192
November 25, 1998
Office of Canadian Affairs
Room 4511
U.S. Department of State
2201 C Street N.W.
Washington, D.C. 20520
Attention: Mr. John Hall
| RE: | Peace Bridge Capacity Expansion Project (PBCEP)
Letter of Application for International Joint Commission Approval Boundary Waters Treaty 1909 |
Dear Sir:
Application is hereby made by the Buffalo and Fort Erie Public Bridge Authority (BFEPBA) for an International Joint Commission (IJC) Order of Approval to construct a multi-span, multiple steel arch bridge over the Niagara River and Black Rock Canal, between Fort Erie, Ontario (Canada) and Buffalo, New York (United States). The project will include five (5) new reinforced concrete piers in the Niagara River. This proposed bridge will be utilized (in conjunction with the existing Peace Bridge) to expand the traffic capacity of the border crossing.
De Leuw, Cather & Co., of New York, Inc. (De Leuw, Cather) is leading a bi-national team of consultants retained by the BFEPBA for this project. An owners authorization letter from the BFEPBA allowing De Leuw, Cather to prepare, submit and track applications on their behalf is attached, see ITEM 2 below.
This Letter of Application is comprised of 12 items, each of which are provided below.
| ITEM 1: | Applicant
Buffalo and Fort Erie Public Bridge Authority
Ph.: (716) 884-6744
| ||||||||||||||||||||||||||||||||||
| Contacts: | Stephen F. Mayer, P.E., Operations Manager
Clifford T. Elwood, Projects Manager | ||||||||||||||||||||||||||||||||||
| ITEM 2: | Applicant's Agent/Consulting Team | ||||||||||||||||||||||||||||||||||
| Applicant's Agent: | De Leuw, Cather & Co. of New York, Inc.
300 Cathedral Park Tower 37 Franklin Street Buffalo, New York 14202
Ph.: (716) 853-6940
Contact: Keith Harlock, P.E., Project Manager | ||||||||||||||||||||||||||||||||||
| Consulting Team: | |
| An owners authorization letter from the BFEPBA allowing De Leuw,
Cather to prepare, submit and track applications on their behalf is enclosed
as Attachment A.
| ITEM 3:
| Project Description
| The project is located adjacent to the existing BFEPBA Peace Bridge located at the mouth of the Niagara River at the extreme eastern end of Lake Erie. The BFEPBA proposes to construct a multi-span, multiple steel arch bridge over the Niagara River and Black Rock Canal, between Fort Erie, Ontario (Canada) and Buffalo, New York (United States). The project will include five (5) new reinforced concrete piers in the Niagara River. The purpose of the project is to expand the traffic capacity of the existing border crossing. ITEM 4:
| IJC Application/Approval for the Existing Peace Bridge
| A copy of the 1925 Application for IJC Approval and subsequent Order of Approval for the existing Peace Bridge are included as Attachment B. ITEM 5:
| Site Layout
| Enclosed in Attachment C are site location maps and general drawings depicting the proposed construction. ITEM 6:
| Description of Existing Structure
| The BFEPBA is the owner of the existing Peace Bridge structure. The structure is a fixed multiple arch steel plate girder bridge. The existing Peace Bridge is located at 1.5 miles north of the Buffalo Harbor Entrance, and has a vertical navigational clearance of 100 feet minimum above Mean Low Water Datum at Elevation 569.20 (IGLD 1985). ITEM 7:
| Proposed Status of Existing Structure
| The existing Peace Bridge structure will not be demolished and will continue to be open to traffic after completion of this project. ITEM 8:
| Schedule/Funding
| Construction activity is expected to commence March 1, 1999 with an approximate completion date of August 7, 2002. Federal, State, and Provincial funds will not be utilized and are not being applied for. The project will be 100% funded by the BFEPBA through toll revenues and bond sales. ITEM 9:
| Environmental Impacts
| The project is not believed to have a significant effect on the environment. The Draft and Final Environmental Assessment Documents have been submitted to the appropriate permitting and reviewing agencies prior to this Letter of Application. If further copies of the Draft and/or Final Environmental Assessments are required for your review, please indicate this to the applicant contacts. ITEM 10:
| Associated Permits, Certifications, and Approvals
| The following other Federal, State, Provincial, and local permits, certifications, and approvals will be required for this project: United States:
Canada:
| ||||||||||||||||
We trust that the information provided will be sufficient for your review. If there are any questions or you require additional information, please do not hesitate to contact this writer at the phone number noted above.
A similar letter and twenty-five copies has also been sent to Mr. David Preston, Director of the Department of Foreign Affairs and International Trade - US Trans Boundary Division in Ottawa, Canada.
Very truly yours,
DE LEUW, CATHER & CO. OF NEW YORK, INC.
Keith J. Harlock, P.E.
Project Manager
Attachments
| cc: | w/o Attachments
S. F. Mayer, P.E. (attn.: C.T. Elwood), PBA D. Chadsey, Lippes Silverstein Mathias & Wexler G. T. Creary, DCCo. |