Maumee River, Ohio
(This section includes Stage of RAP development, Beneficial Use Impairments and
their delisting targets, and information on whether the AOC has been accurately mapped.)
| Stage of RAP Development: |
2 |
|
Are electronic maps available that include the AOC's geographic boundaries
and associated sources of pollution?
|
No |
Beneficial Use Impairments (BUI):
(The BUI will appear underlined if a delisting target has
been determined.
If underlined, click on the BUI to display the delisting target.)
|
| Restrictions on Fish and Wildlife Consumption | | Degraded Fish and Wildlife Populations | | Fish Tumors or Other Deformities | | Degradation of Benthos | | Restrictions on Dredging Activities | | Eutrophication or Undesirable Algae | | Restrictions on Drinking Water Consumption or Taste and Odor Problems | | Beach Closings | | Degradation of Aesthetics | | Loss of Fish and Wildlife Habitat |
|
|
|
CONTAMINATED SEDIMENT
|
Estimated remaining volume of contaminated sediment within the AOC:
|
no information |
|
Remediation to Date
|
|
Project Name:
|
Amount Remediated:
|
Remediation Cost:
|
|
Fraleigh Creek | 10000 cu. yds. | $5000000 |
|
Planned Action Regarding Sediment Remediation
|
|
Project Name:
|
Amt. to be Remediated:
|
Estimated Cost:
|
|
Ottawa River | no information | $2500000 | |
Maumee River site | 3,000,000 cu metres | $260,000,000 |
|
|
|
WASTEWATER INFRASTRUCTURE
|
Improvements to Wastewater Infrastructure - Dollars Spent:
|
| City of Toledo - CSO in the Maumee River/Swan Creek | $40000000 |
| City of Toledo - CSO in the Ottawa River/Swan Creek | $82,000,000 |
|
Identified Future Costs for Wastewater Infra. - Dollars Needed:
|
| City of Toledo - improvements to sewage system | $433000000 |
|
|
|
HABITAT
|
Projects / Proposals / Costs:
|
|
Toussaint River Improvement Incentives Program for sediment and nutrient loading reduction $783,000
| |
Metzger Marsh: Restoration of over 900 acres of Lake Erie marsh | |
Proposed Lake Erie Westerm Basin International Wildlife Refuge |
|
|
|
OTHER SIGNIFICANT ISSUES
|
Issues, including National Priority List (NPL) sites:
|
| Conservation tillage on 233 acres of floodplain & on 32 acres of filter strip |
| 17 wall-to-wall dumps along the Ottawa River - leachate remediation is one of the most expensive issues |
| $4.8M containment wall & leachate collection system completed in 1994 at Dura Ave. Landfill site |
| Tyler Ave & Stickney ave. & Dura Ave. landfill sites remediated |
| Otter Creek was rerouted around an industrial landfill to prevent possible leachate |
|
|
|
MANAGEMENT
| Federal | David Barna, US EPA Region V 25089 Center Ridge Road Westlake, Ohio 44145 (440) 250-1708
|
| State | Cherie Blair, RAP Coordinator Ohio EPA 347 North Dunbridge Road Bowling Green, Ohio 43402 (419) 352-8461
|
| Local | Matt Horvat, Toledo Metro Area Council of Gov. P.O. Box 9508, 300 Dr. Martin Luther King Jr. Driv Toledo, Ohio 43697-9508 (419) 241-9155x123
|
|
|
|
|
|
Please Note:
Values provided are intended as indicators only, and may not
capture all expenditures or work done. Summary is based on best available
Information. "No Information" indicates relevant information was not
available at time of publication.
|
|