Back to Map Open All Close All
U.S.A.
(Click on the different headings to open/close the related information)
Open/Close Maumee River, Ohio
(This section includes Stage of RAP development, Beneficial Use Impairments and their delisting targets, and information on whether the AOC has been accurately mapped.)
Stage of RAP Development: 2

Are electronic maps available that include the AOC's geographic boundaries and associated sources of pollution? No

Beneficial Use Impairments (BUI):
(The BUI will appear underlined if a delisting target has been determined.
If underlined, click on the BUI to display the delisting target.)
Restrictions on Fish and Wildlife Consumption
Degraded Fish and Wildlife Populations
Fish Tumors or Other Deformities
Degradation of Benthos
Restrictions on Dredging Activities
Eutrophication or Undesirable Algae
Restrictions on Drinking Water Consumption or Taste and Odor Problems
Beach Closings
Degradation of Aesthetics
Loss of Fish and Wildlife Habitat
Open/Close
CONTAMINATED SEDIMENT
Estimated remaining volume of contaminated sediment within the AOC: no information

Remediation to Date
Project Name: Amount Remediated: Remediation Cost:
Fraleigh Creek10000 cu. yds.$5000000

Planned Action Regarding Sediment Remediation
Project Name: Amt. to be Remediated: Estimated Cost:
Ottawa Riverno information$2500000
Maumee River site3,000,000 cu metres$260,000,000
Open/Close
WASTEWATER INFRASTRUCTURE
Improvements to Wastewater Infrastructure - Dollars Spent:
City of Toledo - CSO in the Maumee River/Swan Creek$40000000
City of Toledo - CSO in the Ottawa River/Swan Creek$82,000,000

Identified Future Costs for Wastewater Infra. - Dollars Needed:
City of Toledo - improvements to sewage system$433000000
Open/Close
HABITAT
Projects / Proposals / Costs:
Toussaint River Improvement Incentives Program for sediment and nutrient loading reduction $783,000
Metzger Marsh: Restoration of over 900 acres of Lake Erie marsh
Proposed Lake Erie Westerm Basin International Wildlife Refuge
Open/Close
OTHER SIGNIFICANT ISSUES
Issues, including National Priority List (NPL) sites:
Conservation tillage on 233 acres of floodplain & on 32 acres of filter strip
17 wall-to-wall dumps along the Ottawa River - leachate remediation is one of the most expensive issues
$4.8M containment wall & leachate collection system completed in 1994 at Dura Ave. Landfill site
Tyler Ave & Stickney ave. & Dura Ave. landfill sites remediated
Otter Creek was rerouted around an industrial landfill to prevent possible leachate
Open/Close
MANAGEMENT
FederalDavid Barna, US EPA Region V
25089 Center Ridge Road
Westlake, Ohio 44145
(440) 250-1708
StateCherie Blair, RAP Coordinator Ohio EPA
347 North Dunbridge Road
Bowling Green, Ohio 43402
(419) 352-8461
LocalMatt Horvat, Toledo Metro Area Council of Gov.
P.O. Box 9508, 300 Dr. Martin Luther King Jr. Driv
Toledo, Ohio 43697-9508
(419) 241-9155x123


Please Note: Values provided are intended as indicators only, and may not capture all expenditures or work done. Summary is based on best available Information. "No Information" indicates relevant information was not available at time of publication.